Geothermal Program Fact Sheets. This project will increase power production of the combined G1/G2/G3 power plants by up to 10 MWe during the summer months by modifying the existing power plants to utilize evaporative cooling. Phase 1 testing of this project will include the evaluation of three different evaporative cooling technologies. Phase 2 of this project is the construction of permanent power plant modifications and the needed support systems to utilize evaporative cooling. Mammoth Pacific Limited Partnership (MPLP) owns and operates three geothermal binary power plants with a combined on-line power generation of 32 MWe. This resource is available online as a downloadable file. For more information see the link provided. http://datadiscoverystudio.org/geoportal/rest/metadata/item/9322af429b4345ec85d74286f3acff2e/html
Name | Value | Last Modified | |
---|---|---|---|
@context |
|
Extracted by http://clowder.ncsa.illinois.edu/extractors/deprecatedapi on Oct 11, 2020 |
No extraction events recorded.
Views: | 4 |
Last viewed: | Jun 08, 2025 05:11:01 |
Downloads: | 0 |
Last downloaded: | Never |
Last Modified: | Oct 11, 2020 02:56:51 |